| Date |
Construction |
Works |
|
| 23.06.2005 |
McDonald's restaurant in the trade centre «Karavan» was put in commission in Obolon district, Kiev.
|
Turnkey construction. |
|
| 22.12.2002 |
Replacement of the interior at the McDonald's restaurant “Pochtovaya” in Kiev |
Without suspension of restaurant's operation |
 |
| 20.11.2002 |
McDonald's restaurant “Kreschatyk” in Kiev. |
Reconstruction and replacement of the interior without suspension of restaurant's operation. |
|
| 15.10.2002 |
Construction of McDonald's restaurant at 40/25, Bogdana Khmelnitskogo str. in Kiev. |
Turnkey construction. Total area 365 m2 |
|
| 15.04.2002 |
McDonald's restaurant at the Central Shopping Center in Dnipropetrovsk. |
Construction works.Total area 393 m2 |
|
| 15.06.2001 |
Arrangement of McExpress window for food and ice-cream sale in McDonald's – Kreshatik restaurant in Kiev (building of Kreshatik Plaza Center) |
Works were carried out at the main street of Kiev city within 30 days without suspension of restaurant's operation. |
|
| 25.05.2001 |
“Lukaynovka” restaurant in Kiev without suspending operation of the restaurant terminated |
Interior installation works |
|
| 20.05.2001 |
“Naberezhnaya” in Yalta |
Interior installation works |
|
| 15.05.2001 |
Arrangement of Birthday Room at McDonald's Pavlovsky restaurant in Kharkov |
Constrcution works were carried out within 60 days without suspension of restaurant's operation |
|
| 15.10.2001 |
“Petrovka” in Kiev |
Interior installation works |
|
| 13.10.2000 |
“Moskovska Ploshchad” in Kiev of total area 320 m2 |
Turnkey construction |
 |
| 17.11.2000 |
“Vorontsovski Rinok” in Dnepropetrovsk of total area 320 m2 |
Turnkey construction |
 |
| 29.12.1999 |
“Druzba” in Lvov of total area 320 m2 |
HVAC and interior installation works supervision |
 |
| 14.12.1999 |
“Univermag” in Lvov of total area 320 m2 |
HVAC and interior installation works |
 |
| 27.12.1999 |
“Privoksalnaya Ploshchad” in Simferopol of total area 320 m2 |
“Turnkey” construction and interior installation works |
 |
| 17.12.1999 |
“Vinogradar” in Kiev |
Interior installation works |
 |
| 15.12.1999 |
”95 kvartal” in Krivoy Rog of total area 380 m2 |
“Turnkey” construction and interior installation works |
 |
| 09.12.1999 |
“Podstansiya” in Dnepropetrovsk of total area 320 m2 |
“Turnkey” construction |
 |
| 15.11.1999 |
“Elegant” in Lvov of total area 410 m2 |
HVAC installation works |
 |
| 11.09.1999 |
McDonald's - Sumy of total area 320 m2 |
“Turnkey” construction, interior design and installation works |
 |
| 24.08.1999 |
“Minskiy” in Kiev |
Interior design and installation works |
 |
| 15.12.1998 |
“Market” in Chernigov of total volume 1440 m3and total area of 360 m2 |
“Turnkey” construction |
 |
| 21.11.1998 |
“Yuzhny” in Donetsk of total volume 5400 m3 and total area of 1500 m2 |
Complex design of the building including McDonald's restaurant |
 |
| 18.10.1998 |
“Pobeda” in Dnepropetrovsk of total volume 1248 m3 and total area of 320 m2 |
“Turnkey” construction, assistance in interior design and installation works |
 |
| 25.09.1998 |
“Krasny Kamen” in Dnepropetrovsk of total volume 1248 m3 and total area of 320 m2 |
“Turnkey” construction |
 |
| 25.05.1998 |
“Adonis” in Kiev of total volume 1368 m3 and total area of 3600 m2 |
Built for 84 days with premium for preschuled nad-over (design, “turnkey” construction) |
 |
| 21.04.1998 |
“Blagoveshchensky” in Kharkov of total volume 2016 m3 and total area of 480 m2 |
HVAC installation works supervision, imported equipment installation, interior design and installation works |
 |
| 11.03.1998 |
“Ostrovsky” in Dnepropetrovsk of total volume 1710 m3 and total area of 450 m2 |
Design, “turnkey” construction, interior design and installation works |
 |
| 21.12.1997 |
“Radosin” in Kiev of total volume 1 728 m3 and total area of 480m2 |
Design, “turnkey” construction, interior design and installation works |
 |
| 12.06.1997 |
“Pavlovsky” in Kharkov of total volume 4080 m3 and total area of 850 m2 |
Design, “turnkey” construction, interior design and installation works |
 |
| 15.04.1996 |
“Sevastopolska Ploscha” in Kiev |
Remodeling of interior without stoping the work of the restaurant |
 |